About Us
Directional Mining & Drilling Ltd. was launched 20 years ago during the infancy of directional drilling. Incorporated in 1990 in British Columbia, we are one of the oldest, continuously operating directional drilling companies in Canada and are still under the same management as we were when our doors opened 20 years ago. We have done extensive work in British Columbia and Alberta, as well as branching into the US with our subsidiary company Directional Mining & Drilling LLC where we have completed projects in numerous states.
Since our beginnings, we have gained a wealth of experience. We have completed drilling in a variety of ground conditions such as sands, gravels, solid granite, clay etc. We started out with one 10,000 lb. rig and now have eight drilling rigs of various sizes, the largest being 550,000 lbs. In conjunction with our drilling operations, DM&D employees are fully trained in fusing of HDPE. DM&D owns its own fusing equipment for pipe from 1" to 42" in diameter and have fused pipe up to 48" diameter. Recently we began affiliations with MT Horizontal Boring Ltd. and now proudly offer Augur Boring, Pipe Jacking, Tunneling and Pipe Ramming to our list of services provided.
Our philosophy is to provide our clients with reliable and competitive service, all the while maintaining a superior level of professionalism, performance and productivity. We strive for excellence while maintaining the highest level of safety for our employees, respect for the environment and uncompromising quality for our clients.
The Benefits of HDD
When installation is required under areas such
* Waterways * Roadways * Existing Buildings
or with issues such as:
* Highly Congested Areas
* Environmentally Sensitive Areas
* Historical Sites
* Recreational Areas
directional drilling is often the quickest, least expensive and least disruptive way to complete the project.
The increased concerns over costs and ever stricter environmental regulations have dictated that innovative solutions be found. Directional Drilling address's these concerns and offers the following advantages to Project Owners:
- significantly reduced construction time
- year round construction
- de-watering is not required
- eliminates destruction and restoration of landscape
- land and marine traffic is uninterrupted
- negative impact on residents and businesses is greatly reduced
- environmental impact is greatly minimized
The benefits of HDD to a Project Owner are numerous and varied and Directional Mining & Drilling Ltd. has the expertise and experience to meet the challenges of the most demanding directional drilling projects.
Health and Safety
Management of Directional Mining & Drilling Ltd. strive to provide a healthy and safe workplace for our employees. We recognize and acknowledge that the success of our organization lies in the health and well-being of our people. We understand our responsibilitites as established by WorkSafe BC, and endeavor to meet or exceed these.
DM&D has been able to achieve this goal through a functional occupational health and safety program and through the coordinated actions of the employer, supervisors, workers and the health and safety committee. Our Supervisors are the key to the success of the health and safety program at the workplace level. Supervisors learn, understand and follow their responsibilities under requirements established by WorkSafe BC and in turn instruct workers, enforce the Program and maintain a safe workplace.
Our employees receive continuous training in areas such as First Aid, Confined Spaces, WHMIS, etc. Tailgate meetings are held regularly to ensure employees are aware of the job specific hazards they may encounter on each site, coordinate activities with any other contractors and review all emergency and safe work procedures.
The personal health and safety of each employee of DM&D is of primary importance and prevention is given priority over operating productivity where necessary. Our objective is to maintain a program that will reduce the number of injuries and illnesses, not merely in keeping with industry standards, but surpassing them. DM&D's goal is zero accidents and injuries.
Project List
Having been in business for 20 years, DM&D has an extensive portfolio of projects completed. From simple 15m road crossings to shots as long as 800m; ground conditions from sands, silts and clays, to granite; 1" service lines to 48" storm drains; product pipe of HDPE, PVC, Fusible PVC and Steel; DM&D has experience in it all. Following are a few of the more interesting projects we have undertaken over of the years.
Howe Street and Waterfront Project
This project was located in a busy underground parkcade located at the cruise ship terminal in downtown Vancouver. Project scope was installation of a 18" carrier with 4 - 4" ducts insides. While only a short shot (90m), a steep entry and exit angle, SkyTrain rail lines, and support pillars made for a tricky drillpath. The height limitations in the parkcade also made for a very tight working site. Delivery of the equipment required carefully planning and measuring to ensure everything would make it safely down the entrance ramp to the site location.
The parkcade was kept open and running during drilling operations. During staging for pullback of the product pipe it was placed on top of stacked shoring cages to keep the road open for continued access of the delivery trucks to the loading bays.
David Lam Park
This project was an exploratory drill located in the heart of downtown Vancouver. The site was a popluar park surrounded by high rise resident buildings on three side. In order to minimze public impact the site was limited to the area of the park which sloped up to the sidewalk. Actual active park land was not disturbed in any way.
Due to the extremely tight project site, DM&D customized it's drill in order to fit it into the area and utilized a crane to mobilize it into position.
YVR
DM&D was required to drill and install a 16" Sanitary Forcemain (850m total) and manholes from the long-term parking area to the Airports new office building at the terminal. This required the drill to be set up along the New Canada line and for the pipe to be staged in runs underneath the terminal. Room was extremely limited and the pipe string was fused into 6 sections and then fused on the fly during pullback.
Thompson River Crossing
BC Hydro hired DM&D to drill a 580m 36" borehole underneath the Thompson River for the installation of 4 _ 4" and 4 _ 8" un-banded duct bundles. The entry site was set up in the Weyerhaeuser Yard amongst the piles of timber. Work was in close proximity to existing Hydro lines and all employees were required to attend the PSSP training.
The duct bundles were installed in a single pullback. A 24"steel casing approximately 10' long was constructed to protect the bundles from damage from collapsing soils behind the reamer.
Exit side was into a park area and was extremely limited in size. We had to ensure the numerous walking trails were kept opened so as not to be an inconvenience to the local residents whom used them.
Kidd Station
This drilling project took place inside the Kidd Station Hydro PLant. A very tight setup location and was needed for this project. A 600m - 34" bore was completed under the north arm of the Fraser River. 4 _ 8" HDPE pipes were bundled and pulled back.
For a brief description of each picture click on the photo to enlarge.
Equipment List
DM&D's has an extensive inventory of equipment to complete all areas of HDD work. From digging the pits, de-watering, fusing, etc we have everytihing at our disposal without having to rely on rental companies to equip our projects.
Drill Pipe
• 10,000 Feet of 5" (4.5IF) Drill Pipe - 31' average length
• 2,500 Feet of 3 1/2" (2 7/8 IF) Drill Pipe - 20' length
• 2,500 Feet of 3 1/2" (2 7/8 IF) Drill Pipe - 15' length
• 2,500 Feet of 2 3/8" Vermeer Drill Pipe - 10' length
Specialty Drill Pipe
• 1,200 Feet of 2 1/8 Vermeer Drill Pipe 10' length
• 600 Feet of 30/20 AT Rock Drill Pipe 10' length
** Wide variety of Reamer sizes and styles up to 58" Rock Reamer**
Cleaning Systems
• Tri Flow Mud Cleaning System (500gpm)
• MR 1000 Brandt Cleaning System (1000gpm)
• Tulsa Rig Iron Cleaning System (750gpm)
Pumps
• American Augurs MP 135 (Two available)
• Ensco 375 Mud Pump (660 gpm)
• PZ7 Mud Pump (550gpm)
• 4" Godwin De-Watering Pumps
• 6" Godwin De-Watering Pumps
• 4" Godwin Pit Pump
• 6" Godwin Pit Pumps (Two available)
• 3" Wagner Trash Pump
• 4" Toyo Electric Pumps
Butt Fusion
• Christie Fusing Machine Up to 8"
• McElroy Fusing Machine Up to 4"
• Centra Fusing Machine 8" to 20"
• Connectra Fusing Machine 20" to 42"
Electro-Fusion
• Centra Electro-Fusion Machine
• Targa Electro-Fusion Machine
Boring Machines
• 36 Bore-It Boring Machine
• 42 American Augurs Quick Track Machine
Generators
• 210 KW Generator
• 275 KW Generator (Quiet Pack)
• 70 KW John Deere Quiet Pack Generator
• 375 KW Quiet Pack Generator
**Plus 3 small portable gasoline generators
Excavators
• 350 John Deere Excavator
• 330 Cat Excavator
• 270 John Deere Excavator
• 228 Komatsu Excavator
• 225 John Deere Excavator
• 200 Hitachi Excavator
Backhoes
• 310 John Deere Back Hoe
• 140 Komatsu Back Hoe
Skid Steer
• John Deere 332 Skid Steer
Vehicles
• Mac Water Truck
• Mac Flat Deck HIAB
• Ford F750 Vac Master (Vac Truck)
• GMC W5500 Isuzu (Mud System)
• Numerous Commercial Trucks, Trailers, Flat Decks and Crew Vehicles
MIiscellaneous Equipment
• Ingersoll Compressor
• CFM 1800 Compressor
• U-Built Lay Down Machine
• Lincoln Welder
• Miller Big 40 Welder
• Miller Trailblazer Welder
• 20 Pipe Rollers - Up to 48"
• 20 Pipe Rollers - 24" and down
US Office
27 North 27th Street Suite 1900
Billings, Montana USA 59101
Toll Free: 1.888.572.5117
Head Office
C106 - 19770 94A Avenue
Langley BC V1M 3B7
Tel: 604.513.9820 Fax: 604.513.9821
Directional Mining & Drilling Ltd.
Contact Us
If you would like to speak with a representative of DM&D please feel free to call us at our office or fill in the Contact Form and someone will get back to you. We will be happy to provide a quote, answer any questions or supply any additional information you may require.
Contacts
Jack Maloney - President
Gina Godard - Safety / Administrative Coordinator
Moe Abed - Civil and Infrastructure Division