Project List
Following is a cross section sample of some of the hundreds of projects which Directional Mining & Drilling has completed in its 20 years in business.
DELTA SANITARY SEWER FORCEMAIN TWINNING
Location: Delta, BC - Along side Burns Bog
Pipe Size: 5000m of 24", 30" and 32" DR17 HDPE Pipe
Conditions: Peat, Clay and Boiling Sands
An upgrade of the old sanitary sewer system was set during the construction of the new South Perimeter Road. Drilling was in an environmentally sensitive area. The borepath ran parallel to the irrigation ditches for the farms, with a section running underneath the cranberry fields.
________________________________________
BC TRANSMISSION CORPORATION
Location: David Lam Park, Vancouver
Conductor: 60" casing for 100'
Pipe Size: No Pipe - 42" Push Ream for Exploratory Drill Only
Conditions: Till into bedrock (sandstone)
This project was located in a densely populated are in downtown Vancouver. Location was in a park which had an elementary school located on the far corner (The children utilized the Park during recess and lunch hours). High rise resident buildings surround the park on 3 sides with the fourth side running along the sea walk along False Creek
________________________________________
BC HYDRO
Location: Waterfront & Howe Street, Vancouver
Pipe Size: 18" HDPE Carrier pipe with 8 _ 4" ducts (HDPE) pulled through.
Conditions: Fill into bedrock
This project was located in an underground parkcade which had to be kept open during the drilling and pullback stages. The parkcade was located along the Waterfront and cruise ship terminal. Drilling was underneath rail and Sky Train tracks.
________________________________________
BC HYDRO
Location: Thompson River, Kelowna
Conductor: 48" casing for 90'
Pipe Size: 580m of 4 _ 4" and 4 _ 8" HDPE Pipe bundled & pulled through a 36" reamed
borehole
Conditions: Sands and Silts with small gravels
This project was completed in an environmentally sensitive area. The exit side was situated in a Park where the public still had access to. Entry was located in the Weyerhaeuser Yard, set up amongst the log piles.
________________________________________
GREATER VANCOUVER REGIONAL DISTRICT
Location: Sunset Beach, Vancouver
Conductor: Entry - 60" casing for 60' and Exit - 54" casing for 200'
Pipe Size: 440m of 40" HDPE Pipe
Conditions: Fills, Tills and Bedrock (sandstone/silts)
Set in a highly populated urban setting. Entry and exit were both located in the middle of public parks located along the seawall in downtown Vancouver.
________________________________________
SPECTRA ENERGY
Location: McMahon Gas Plant, Taylor, BC
Pipe Size: Slip-lining a 16" high pressure water line with a 14" HDPE Pipe for 450m plus 4 new
28" HDPE Pipes for cooling water lines slip-lined inside of existing 30" lines.
Conditions: Slip-lining existing lines.
Work took place inside the Gas Plant and Safety was of the upmost importance!
________________________________________
DISTRICT OF MAPLE RIDGE
Location: Maple Ridge, BC
Pipe Size: 800m of 42"ID - 48"OD HDPE Pipe
Conditions: Silty Sands and Clay
This entailed an on-grade storm line which had to empty into a fish bearing creek. The end of the line was sheet piled during installation and the end was dug out and rip rap place from end to creek. The creek was also lowered to match grade. The drilling took place in a residential area, with a school along the drill path. Line also had to run underneath a highway.
________________________________________
PORT MANN/HWY 1 BAYHILL CONTRACTING
Location: Greater Vancouver, BC
Pipe Size: 2" and 4" HDPE Duct Bundles
Conditions: Sands and Gravels
Completed 20+ crossings of 2" and 4" HDPE duct bundles for communications lines under Highway 1. Work was completed during night shifts. DM&D employees had to complete the Kiewit Flatiron Safety Orientation.
________________________________________
PENN WEST PETROLEUM
Location: Edson, Alberta
Pipe Size: 500m of bundled 4", 6" and 18" steel pipe
Conditions: Gravels and Shale
________________________________________
PENN WEST PETROLEUM
Location: North Helmet, BC
Pipe Size: 240m of 16" steel pipe
Conditions: Gravels
________________________________________
WALTERS CONSTRUCTION
Location: Richmond, BC
Pipe Size: 500m of 28" HDPE pipe
Conditions: Sand, Clay and Woods
Installation of a water line under the Fraser River
________________________________________
HUSKY OIL
Location: Beaver River, AB
Pipe Size: 1000m of coated 18" steel pipe
Conditions: Sandstone and Shale
________________________________________
GREYSTONE PROPERTIES
Location: Kidd Station Hydro Plant, Metro Vancouver, BC
Pipe Size: 600m of 4 - 8" HDPE Duct Bundles
Conditions: Sandy Soil with Obstacles
Set-up for this drill under the Fraser River required the equipment to be set up inside the Hydro Plant. Ream was to 36" for the installation of the 4-8" ducts.
________________________________________
PRAIRE PIPELINE
Location: Casper, Wyoming
Pipe Size: 3 crossings at 1200m of 22" steel pipe
Conditions: Shale, Hard Rocks and Gravels
________________________________________
CANADIAN NATIONAL RESOURCES LTD.
Location: Edson, Alberta
Pipe Size: 5 runs of up to 350m of 8" steel and 1 run of 16" steel for 150m
Conditions: 8" through shales and the 16" through gravels.
________________________________________
360 NETWORKS
Location: Renton, Washington
Pipe Size: 600m of 20" steel pipe
Conditions: Boulders and Glacial Till
Environmentally sensitive and heavily populated area with the drilling taking place under the 405, service roads and creek area. A 30" ream was done for the installation of the 20" pipe.
________________________________________
360 NETWORKS
Location: Bellevue, Washington
Pipe Size: 350m of 20" steel pipe
Conditions: Heavy surface gravels and Granite
________________________________________
360 NETWORKS
Location: Chico, California
Pipe Size: 400 m of 12" steel pipe
Conditions: Gravel Bore
An 80,000lb and 250,000lb drilling rigs had previously tried to complete this bore. DM&D completed the bore and installation of the pipe using a 140,000lb rig.
________________________________________
TEXACO
Location: South of Edson, AB
Pipe Size: 300m of 4", 10" and 16" steel pipe
Conditions: Gravel and Hard Pan
Installation under the McLeod River
________________________________________
MAJOR PIPELINE LLC.
Location: Gillette, Wyoming
Pipe Size: 240m of 16" .406 wall steel pipe
Conditions: Shale
Installation under the Powder River
________________________________________
FRASER PORT AUTHORITY
Location: Richmond, BC
Pipe Size: 5000m of 20" HDPE pipe
Conditions: Boiling Sands, Clay and Wood
Numerous bores with the longest being 1066m.
________________________________________
NESKONLITH INDIAN BAND
Location: Chase, BC
Pipe Size: 450m of 12" HDPE pipe
Conditions: Sand and Gravels
Installed water line under the South Thompson River
________________________________________
KAMLOOPS INDIAN BAND
Location: Kamloops, BC
Pipe Size: 425m of 14" HDPE pipe
Conditions: Sand and Gravels
Installed a sanitary forcemain under the South Thompson River.
________________________________________
BC GAS
Location: Serpentine River, Surrey
Pipe Size: 450m of 16" steel with compound bends
Conditions: Gravel and Clays
________________________________________
LEDCOR
Location: Harrison River, Harrison Hot Springs, BC
Pipe Size: 550m of 8" steel pipe
Conditions: 50,000 PSI Granite
________________________________________
PRAIRIE PIPELINE CONTRACTORS INC.
Location: Morgan City, Utah
Conductor: 36" for 120'
Pipe Size: 16" Steel
Conditions: Gravels and Sand
________________________________________
SURERUS PIPELINE
Location: Fort St. John & Fort Nelson, BC
Pipe Size: 4000m total of 18" and 6" bundled steel epoxy coated pipe
Conditions: Sandstone and Till
Drilling and installation in sub-zero weather conditions.
________________________________________
CITY OF RICHMOND
Location: Richmond, BC
Pipe Size: 500m total of 18" HDPE pipe
Conditions: Boiling Sand, Clay and Wood
Installation under the Fraser River.
________________________________________
CITY OF ABBOTSFORD
Location: Abbotsford, BC
Pipe Size: 610m total of 26" HDPE pipe
Conditions: Sand and Clay
Installation of a new gravity sewer line at .046% grade.
________________________________________
CITY OF ABBOTSFORD
Location: Abbotsford, BC
Pipe Size: 300m total of 24" steel pipe
Conditions: Sand and Clay
Installation of a new gravity sewer line at .046% grade.
________________________________________
CITY OF ABBOTSFORD
Location: Abbotsford, BC
Pipe Size: 200m total of 12" HDPE pipe
Conditions: Glacial Till and Gravel
Installation of a new gravity sewer line at 2% grade.
________________________________________
GOULD CONSTRUCTION
Location: I70 and Colorado River, Utah Border
Pipe Size: 1000' of 14" HDPE Pipe
Conditions: Sandstones and Sand
________________________________________
BEAR PAW ENERGY
Location: Fairview Montana Yellowstone River Project
Pipe Size: 2600' of 8" steel Pipe
Conditions: Silty Sands and Small Gravels
________________________________________
FREDRICK NOVA
Location: Vancouver International Airport, Vancouver
Pipe Size: 300m of 20" .750 wall steel pipe
Conditions: River sands
________________________________________